Management and Development of Existing Assets

The extensive compression train and system design expertise held by MSE engineers is applied to identify solutions to optimise production of existing assets. This includes, but not limited to:
 

Compressor revamps
Compressor rewheels
Driver upgrades
Installation of additional compression capacity - e.g. boosters
Installation of parallel (above ground) pipelines
Drilling of additional wells
Process plant de-bottlenecking



MSE have been instrumental in increasing the capacity of numerous gas assets, and have been engaged long-term by many clients to manage asset modifications through life of the field to ensure optimum production is maintained.