How many wells should I drill and can I increase project NPV by phasing the drilling over time?
When is the optimum time to install compression, and what is the optimum amount of compression power?
What is the effect of machinery outage on production for different compressor configurations?
How can I reduce sensitivity to variation in actual well performance?
|
|
|
When will I reach end-of-plateau, and what will be the constraint?
What gain in production will I achieve with a re-wheeled compressor?
|
|
|
|
|
|